Brand Name: | SOGA |
Model Number: | SG-G2-720W |
Payment Terms: | L/C, T/T, Western Union |
Outdoor LED Stadium Lights LED 720W Sports Light Football Volleyball Tennis Court CE Certificate IP65
SPECIFICATIONS
From 100W to 1440W
Light weight with fin-style Aluminum heatsink
Multifunctional lighting application
Different brackets for different installation ways (such as poles or wall mounted)
More uniform lighting with the rotatable modular design
Glare Control with light spill cover
Free Dialux Simulations
Smart Wireless Control
Input Voltage | AC90-305V/AC108-528V |
Housing | Aluminum |
LED Brand | Lumileds 5050 |
Bracket | iron or Stainless Steel |
CRI | 70 80 90 |
Driver | Meanwell, Sosen, Inventronics |
Operating Temp | -40°C to 55°C |
CCT | 3000K 4000K 5000K 5700K 6500K |
MODEL | SG-G2-120W | SG-G2-240W | SG-G2-360W | SG-G2-480W | SG-G2-720W | SG-G2-960W | SG-G2-1200W | SG-G2-1440W |
MODEL QTY | 1 | 2 | 3 | 4 | 6 | 8 | 10 | 12 |
POWER | 120W | 240W | 360W | 480W | 720W | 960W | 1200W | 1440W |
LUMEN OUTPUT | 18000LM | 36000LM | 54000LM | 72000LM | 108000LM | 144000LM | 180000LM | 216000LM |
Detachable Drivers with SOGA Plug and Play Connecting System
Driver can be installed under the pole,
which can be quick connected with the lamp body by SOGA Plug and Play connecting cable.
FAQ:
Q1. What about the VS lead time ?
A:Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than.
Q2. Does VS have any MOQ limit for LED Lights order ?
A: Low MOQ, 1pc for sample checking is available.
Q3. How do you ship the goods and how long does it take to arrive ?
A: We usually ship by DHL, UPS, FedEx or TNT. Airline and sea shipping also optional.
Q4. How does VS proceed an order for LED Fin High Bay Lights ?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.
Brand Name: | SOGA |
Model Number: | SG-G2-720W |
Payment Terms: | L/C, T/T, Western Union |
Outdoor LED Stadium Lights LED 720W Sports Light Football Volleyball Tennis Court CE Certificate IP65
SPECIFICATIONS
From 100W to 1440W
Light weight with fin-style Aluminum heatsink
Multifunctional lighting application
Different brackets for different installation ways (such as poles or wall mounted)
More uniform lighting with the rotatable modular design
Glare Control with light spill cover
Free Dialux Simulations
Smart Wireless Control
Input Voltage | AC90-305V/AC108-528V |
Housing | Aluminum |
LED Brand | Lumileds 5050 |
Bracket | iron or Stainless Steel |
CRI | 70 80 90 |
Driver | Meanwell, Sosen, Inventronics |
Operating Temp | -40°C to 55°C |
CCT | 3000K 4000K 5000K 5700K 6500K |
MODEL | SG-G2-120W | SG-G2-240W | SG-G2-360W | SG-G2-480W | SG-G2-720W | SG-G2-960W | SG-G2-1200W | SG-G2-1440W |
MODEL QTY | 1 | 2 | 3 | 4 | 6 | 8 | 10 | 12 |
POWER | 120W | 240W | 360W | 480W | 720W | 960W | 1200W | 1440W |
LUMEN OUTPUT | 18000LM | 36000LM | 54000LM | 72000LM | 108000LM | 144000LM | 180000LM | 216000LM |
Detachable Drivers with SOGA Plug and Play Connecting System
Driver can be installed under the pole,
which can be quick connected with the lamp body by SOGA Plug and Play connecting cable.
FAQ:
Q1. What about the VS lead time ?
A:Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than.
Q2. Does VS have any MOQ limit for LED Lights order ?
A: Low MOQ, 1pc for sample checking is available.
Q3. How do you ship the goods and how long does it take to arrive ?
A: We usually ship by DHL, UPS, FedEx or TNT. Airline and sea shipping also optional.
Q4. How does VS proceed an order for LED Fin High Bay Lights ?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.